North Fork Peachtree Creek Storage and Pump Station
Client: City of Atlanta | Department of Watershed Management
Project Location: Atlanta, Georgia
Project Description:
The North Fork Peachtree Creek Tank and Pump Station Project will construct an off-line temporary 15-million-gallon storage tank for peak wet weather sewage flow, aided by a 75 MGD pump station. During significant wet weather events, peak flow will be diverted from the North Fork trunk sewer to the off-line storage tank. The stored flow will be returned to the trunk sewer immediately following the wet weather event. The purpose of this project is to significantly reduce the number and volume of sewer overflows along the entire length of the Peachtree Creek trunk sewer system, including eliminating sewer overflows during a 10-year, 4-hour storm and smaller back-to-back storms.
Services Provided:
- Engineering Design
- Hydrologic & Hydraulic Modeling
- Three-phased erosion, sediment & pollution control